We are thrilled to share the latest updates on our ongoing construction activities. Our team has been working diligently to ensure that every aspect of our project is progressing smoothly and on schedule. Here’s a detailed look at what has been happening on site:
Masonry Veneer
The masonry veneer installation is in full swing. This phase involves applying a beautiful and durable exterior layer to the building, enhancing both aesthetics and structural integrity.
Our roofing team is hard at work completing the roof. This critical task ensures that the building is well-protected from the elements, providing a safe and dry environment inside.
Interior Drywall
Interior drywall installation is moving forward efficiently. This process involves setting up the interior walls that define rooms and spaces, laying the groundwork for the next stages of construction.
Classroom Millwork
We are excited to see the classroom millwork taking shape. Custom cabinetry and woodwork are being installed, providing functional and stylish storage solutions for our educational spaces.
Ceramic Tile Flooring and Walls
The installation of ceramic tile flooring and wall coverings is progressing well. These durable and attractive surfaces will add a touch of elegance and practicality to various areas of the building.
Acoustical Ceilings
Our team is installing acoustical ceilings to improve sound quality and reduce noise levels within the building. This is particularly important in creating a conducive learning environment.
Electrical Rough and Finish
The electrical team is busy with both rough-in and finishing work. This includes setting up wiring and electrical systems that will power our building and ensure all electrical components are safe and operational.
HVAC, Plumbing, Fire Protection Finish
Significant progress is being made in the final stages of HVAC, plumbing, and fire protection systems. These critical installations are essential for the building’s functionality and safety.
Painting
Painting crews are applying fresh coats of paint throughout the interior and exterior of the building. The new paint will not only beautify the space but also protect surfaces from wear and tear.
Installing Interior Doors
Interior door installation is underway. These doors will provide privacy, security, and a finished look to the building’s interior spaces.
Installing Windows
We are currently installing windows, which will allow natural light to flood the interiors, creating bright and welcoming environments for all occupants.
Site Work
Outside the building, extensive site work is being completed. This includes:
Drainage: Implementing effective drainage systems to prevent water accumulation and ensure a stable foundation.
Exterior Sidewalks: Constructing safe and accessible walkways for ease of movement around the site.
Bench Footings: Setting up foundations for outdoor seating areas.
Cafeteria Seating Wall: Building a seating wall for the cafeteria to provide comfortable outdoor dining options.